How to Prepare for a Heavy Lift

A good lift starts before the crane arrives. Gather these details and the crew can plan the right setup and give you a clear quote.

Know the load

Find the weight on the nameplate or the supplier data sheet. Note the dimensions and where the lifting points are. If the load is packed, include the packing weight.

Know the route and the target

Describe where the load sits now and where it must go: floor, rooftop, opening or truck. Note the distance between the two points.

Check the site

Look at the space where a crane would stand, and the ground under it. Look up for cables, signs and structures. Check whether the access road can take a crane and a trailer.

Arrange permissions early

Ask your building administration or landlord what they need for a lift. Some jobs also need a lane or road closure from the local authority. Start these early because they can take time.

Send photos and a short video

Photos of the load, the route and the landing spot show the crew details a description cannot. Send them with your request or on the booking call.

On the day

Keep people out of the lift zone, give the crew one point of contact and keep the area clear until the load is set down and released.

Need help with this? See our Industrial Rigging service

More guides

Practical checklists from the crew, free to read.

Machinery relocation checklist

A step-by-step checklist for moving factory machines in Cebu: inventory, site checks, disconnection, packing, move day and reinstallation.

Read the guide

Crane lift or rigging basket

Learn when a job needs a crane lift, a rigging basket or a manbasket, and the load, reach and site details that decide the method.

Read the guide

Machinery crating for export

What to prepare before crating machinery for export or storage: size and weight, destination, protection, labels and paperwork.

Read the guide

Ready to plan your job?

Send the details or book a call. We reply with a quote.

Call WhatsApp Request a Quote