Machinery Crating for Export: What to Prepare

A machine that ships by sea or air needs protection for the whole trip. Prepare these points and the crating can be planned correctly the first time.

Give the machine details

Send the machine type, size and weight, and photos. Note any parts that are fragile, that stick out or that must be removed before crating.

Say where it is going

Tell the crew the destination and whether it ships by sea or air. Your freight forwarder can tell you any packing rules for that route and the destination country.

Check wood packaging rules

Some countries require wood packaging to carry a treatment mark, such as the ISPM 15 mark. Confirm this with your forwarder before the crate is built.

Protect against moisture and movement

Machines need protection from moisture and shock. The crate should hold the machine firmly so it cannot shift, with protection for exposed parts.

Plan the lift and the loading

The crate needs forklift or crane access for loading. Our rigging crew can lift, pack and load in the same job.

Label and document

Mark handling instructions on the crate. Keep a packing list that matches what is inside, with weights and dimensions, for your forwarder and customs paperwork.

Need help with this? See our Packing and Crating service

More guides

Practical checklists from the crew, free to read.

Machinery relocation checklist

A step-by-step checklist for moving factory machines in Cebu: inventory, site checks, disconnection, packing, move day and reinstallation.

Read the guide

Crane lift or rigging basket

Learn when a job needs a crane lift, a rigging basket or a manbasket, and the load, reach and site details that decide the method.

Read the guide

Prepare for a heavy lift

What to know and arrange before booking a crane or rigging crew: weights, lifting points, access, permissions and photos to send.

Read the guide

Ready to plan your job?

Send the details or book a call. We reply with a quote.

Call WhatsApp Request a Quote