1. Make an inventory of every machine
List each machine with its make, model, weight and dimensions. Take photos from several angles, including the nameplate. Weight and size decide the crane, the rollers and the trailer, so they come first.
2. Check both sites
Walk the route from the machine to the truck, and from the truck to the new spot. Measure door widths, ceiling heights, ramps and turning space. Check the floor where the machine will sit.
- Access: doors, lifts, ramps, gates and the distance from truck to floor
- Floor: strength, level and whether anchors or a foundation are needed
- New site: utilities and foundation ready before the machine arrives
3. Plan disconnection and reconnection
Decide who disconnects power, air, water and coolant, and who reconnects and tests them. Label every cable and hose before it comes off. Machine suppliers and licensed electricians normally handle commissioning, so book them for the new site.
4. Protect the machine for the trip
Secure moving parts, wrap or crate sensitive components and protect against moisture. A machine that is packed where it stands never has to travel unprotected. Mark crates with handling labels and a packing list.
5. Schedule around production
Agree the downtime window, and confirm delivery times and any building rules with the site administration. Allow for weather on any outdoor lift or loading step.
6. Run the move day with one plan
Clear the route. Hold a short briefing so everyone knows who gives the signals and where people must stay clear. Take photos before and after each step.
7. Reinstall and test
Set the machine level, anchor it and reconnect utilities. Run a test cycle and compare the result with what you recorded before the move.