Machinery Relocation Checklist for Factories in Cebu

Moving a machine goes wrong when the details are missing. Use this checklist to plan a move, whether you handle it yourself or hand it to a rigging crew.

1. Make an inventory of every machine

List each machine with its make, model, weight and dimensions. Take photos from several angles, including the nameplate. Weight and size decide the crane, the rollers and the trailer, so they come first.

2. Check both sites

Walk the route from the machine to the truck, and from the truck to the new spot. Measure door widths, ceiling heights, ramps and turning space. Check the floor where the machine will sit.

  • Access: doors, lifts, ramps, gates and the distance from truck to floor
  • Floor: strength, level and whether anchors or a foundation are needed
  • New site: utilities and foundation ready before the machine arrives

3. Plan disconnection and reconnection

Decide who disconnects power, air, water and coolant, and who reconnects and tests them. Label every cable and hose before it comes off. Machine suppliers and licensed electricians normally handle commissioning, so book them for the new site.

4. Protect the machine for the trip

Secure moving parts, wrap or crate sensitive components and protect against moisture. A machine that is packed where it stands never has to travel unprotected. Mark crates with handling labels and a packing list.

5. Schedule around production

Agree the downtime window, and confirm delivery times and any building rules with the site administration. Allow for weather on any outdoor lift or loading step.

6. Run the move day with one plan

Clear the route. Hold a short briefing so everyone knows who gives the signals and where people must stay clear. Take photos before and after each step.

7. Reinstall and test

Set the machine level, anchor it and reconnect utilities. Run a test cycle and compare the result with what you recorded before the move.

Need help with this? See our Machinery Relocation service

More guides

Practical checklists from the crew, free to read.

Crane lift or rigging basket

Learn when a job needs a crane lift, a rigging basket or a manbasket, and the load, reach and site details that decide the method.

Read the guide

Prepare for a heavy lift

What to know and arrange before booking a crane or rigging crew: weights, lifting points, access, permissions and photos to send.

Read the guide

Machinery crating for export

What to prepare before crating machinery for export or storage: size and weight, destination, protection, labels and paperwork.

Read the guide

Ready to plan your job?

Send the details or book a call. We reply with a quote.

Call WhatsApp Request a Quote